Last week, Peter Opsahl and Design Engineer Eric Chin had the opportunity to see one of their projects erected in a remarkable way. Because of location challenges, the Pinnacle Peak Fire Lookout was assembled in parts at a secondary location lower on the mountain before being taken to the peak for final erection via helicopter. It took the helicopter 6 trips to bring all the pieces to the peak for...